Romania - Clive's House and Excursions

I’ve just scrolled back a page or to of this thread and realize that things have moved on with the work to the back bedrooms, so here’s some update pics. Not finished - finished yet … but pretty close.

for the bathrooms, we just need to buy 2 toilet systems, 2 washbasins & vanity units and 2 heated towel-rail thingies and plumb them all in…

For the bedrooms, some light switches, ceiling and wall lights, power outlets and re-assemble the beds.

Both rooms are at the same stage…

job done (almost) :dance:

35651F4F-23EC-444E-A89A-7CB9B9772D38.jpeg
42DEE55F-FE20-49BC-A4CB-AF7422E522D8.jpeg
6A340CA5-78C1-4566-9E82-19C8393DC7E4.jpeg
279E4CCD-66FA-4F41-BF3C-DC3345E92163.jpeg
8F547C2D-15F7-4127-AB44-267904FEB32C.jpeg
FA600F5F-1224-4F70-BEBB-B35B88B700D6.jpeg
25DCFE4F-CDB3-416D-BF0B-495252A66DB0.jpeg
D85BF2A5-FAC1-4E1A-91E4-08259BDB28AC.jpeg
BE9FDCB4-95EE-4A3E-BB86-CEB6E8A6CAC3.jpeg
 

Attachments

  • 59E406D8-7A66-44B7-A047-5587B06126F3.jpeg
    59E406D8-7A66-44B7-A047-5587B06126F3.jpeg
    226.4 KB · Views: 14
Last edited:
Back
Top