Another update, I have begun assembling the doors. [emoji3][emoji3][emoji3] however I have hit a wee snag or two.
1. The hinges I've ordered three or more weeks ago, have not turned up.
2. The catches foul the inner frame BUT are deep enough to latch at this point so I intend fitting some plastic blocks where they bear down on the frame to form a decent- hopefully be non squeaking point for them to catch against. (I'll put a picture up). This will possibly involve a cut out in the back cubby panel under the door dependent on the design.
Neither are major problems and I should have some more together this weekend. [emoji4]
1. The hinges I've ordered three or more weeks ago, have not turned up.
2. The catches foul the inner frame BUT are deep enough to latch at this point so I intend fitting some plastic blocks where they bear down on the frame to form a decent- hopefully be non squeaking point for them to catch against. (I'll put a picture up). This will possibly involve a cut out in the back cubby panel under the door dependent on the design.
Neither are major problems and I should have some more together this weekend. [emoji4]