Howmanygoes
Well-Known Member
- Joined
- Jan 14, 2019
- Messages
- 760
- Country Flag
Well the time has come and funds allow to get some rust attended to in the boot spac/arches. Unfortunately this meant removing all of my custom galley, electrics and plumbing. The positive means that it's an ideal time to install my gullwings.
I've just ordered these from Australia via The Crusier Company. £560 for a pair shipped plus duty and tax on arrival. About 6weeks wait.
I spoke with Oliver at the company, very helpful and progressed the sale.
I will do a wite up of the install and feedback on quality, fit etc.
I plan to use 1 side as a services access and quick access to some equipment. The other side will be to allow quick access to the cargo area without opening all the swing arms.
I've just ordered these from Australia via The Crusier Company. £560 for a pair shipped plus duty and tax on arrival. About 6weeks wait.
I spoke with Oliver at the company, very helpful and progressed the sale.
I will do a wite up of the install and feedback on quality, fit etc.
I plan to use 1 side as a services access and quick access to some equipment. The other side will be to allow quick access to the cargo area without opening all the swing arms.