My Final Week On The Tree House Project.

OK Update time.................................

We arrived at the farm just after lunch on the Monday.

DSCN5125_zpsdegtezua.jpg


We towed the scaffold tower and a load more wood up with us.

DSCN5126_zpsbilgcnas.jpg


First job was to clad the end section of the veranda roof.

DSCN5128_zps2ndncskg.jpg


DSCN5129_zpsxhsiflcw.jpg


We set the tower up.

DSCN5130_zpsnoqp5bs3.jpg


And clad the end.

DSCN5131_zpsmptv5otg.jpg


Staircase next.

My boss wanted to use the flight he found in the river at the bottom.

DSCN5132_zpsgtwbgsvz.jpg


We marked and drilled the holes for the cypress pine posts.

DSCN5133_zpsgtykrbka.jpg


DSCN5134_zpspucefin7.jpg


DSCN5135_zps2p8vlb1f.jpg


With the posts clamped in position to form the landing/platform, I could mark out the string for the next staircase.

DSCN5136_zpscwfbojkc.jpg


DSCN5137_zps9qljzelx.jpg


DSCN5138_zpsf8njngar.jpg


We then went up to the shed to machine the strings.

DSCN5139_zpspgi9rztk.jpg


DSCN5140_zpsev4jpxu7.jpg


I used a circular saw and chisel to rebate the strings for the treads.

DSCN5141_zpsgacs0eli.jpg


DSCN5142_zpsfdza162i.jpg


Cut, glued and screwed all the treads in position.

DSCN5143_zpsngazb9v9.jpg


We then got it into position.

DSCN5144_zps9og1iwgn.jpg


DSCN5146_zps8vwj5iwo.jpg


DSCN5148_zpsjhxrvc1e.jpg


DSCN5156_zps90tgiirq.jpg


We had to adjust the holes slightly to get the posts in the perfect position.

We then concreted them in position.

DSCN5149_zpspozaoczq.jpg


DSCN5150_zpsbs3casew.jpg


DSCN5151_zpsdobgxd93.jpg


DSCN5152_zpswpnwfywi.jpg


DSCN5154_zpsr5ziopst.jpg


We had lots of problems through out the week with sheep escaping and getting into the neighbors property who had just spent a lot of money on plants for their garden. :doh:

This meant I got to ride the little 250cc Suzuki to help round them up, which was awesome fun!! I loved it! :icon-twisted: :dance:

DSCN5155_zps4jjme2yf.jpg


Back on the tree house build............................

We fitted hardwood boards on the landing.

DSCN5157_zps6ndwulaa.jpg


We then did some work on the interior as it started raining.

Mezzanine next.

Screwed some 4" x 2" oak along the walls.

DSCN5158_zps1hwv1yiq.jpg


DSCN5159_zpslloix2en.jpg


We could then fit some joists.

DSCN5160_zpskfhjxvd7.jpg


And mark where the tree needed cutting.

DSCN5161_zpsecgltthi.jpg


DSCN5162_zps1vm3jmve.jpg


My boss, Alan, then cut the top off the tree.

DSCN5163_zps4zd3y3ow.jpg


DSCN5164_zpsvbs0qurq.jpg


Safety first! :shifty:

DSCN5166_zpsf7o45slt.jpg


DSCN5171_zps8h21kfaw.jpg


First chunk off.

DSCN5172_zpslfxjgxbp.jpg


Next chunk.

DSCN5174_zpsmvgznmka.jpg


Off.

DSCN5176_zps2la58d8u.jpg


Michael and I then marked and cut the tree so that a floor joist would fit neatly into it.

DSCN5177_zpsbouu8eom.jpg


DSCN5178_zps9bkev3jd.jpg


DSCN5180_zpsxhntjpex.jpg


DSCN5183_zpsvzge89ty.jpg


DSCN5185_zpsu7stlf9d.jpg


All the joists in.

DSCN5187_zpshrttrf74.jpg


DSCN5188_zpsm3ofcp6r.jpg


Pine tongue and groove floor boards next.

DSCN5189_zpskxxkd4gb.jpg


DSCN5190_zps2rcdlhxz.jpg


DSCN5193_zpscj9gwvfo.jpg


DSCN5195_zpsnkaxx5fk.jpg


DSCN5196_zpsfmxiaybv.jpg


DSCN5198_zpssvsn1yq4.jpg


DSCN5212_zpsqo26otss.jpg


DSCN5213_zpsm7fywddb.jpg


DSCN5214_zpsoxvemah7.jpg


DSCN5215_zpslkjlpmhr.jpg


DSCN5216_zpsxjp02rwa.jpg


Alan found out a 100+ year old ladder which we thought would look great as the ladder up to the mezzanine.

DSCN5219_zpsnrqwlrey.jpg


With the rain gone we ventured back outside to finish the veranda roof.

Fitted the High Lift jack, gallows brackets.

DSCN5206_zpsuxek20sh.jpg


DSCN5207_zpszbfrnrml.jpg


Followed by rafter and hip timbers.

DSCN5224_zpsynlal8x2.jpg


DSCN5225_zpsphhi8h39.jpg


DSCN5226_zpslz2cqjv2.jpg


We could then finish cladding the roof in the tin sheets.

DSCN5232_zpsedefvuln.jpg


DSCN5233_zpslwy6gecp.jpg


DSCN5235_zpsrimlpcnv.jpg


DSCN5236_zpsysjnpvl6.jpg


DSCN5240_zps3oxwyfti.jpg


DSCN5241_zps5zicfber.jpg


We fitted a piece of oak with a hole through the middle, for the top of the firemans pole to mount to.

DSCN5239_zpslhdcs0g7.jpg


We needed to clad the end section of roof above the firemans pole.

DSCN5242_zpsreijqaro.jpg


DSCN5243_zpstjxfuq0f.jpg


DSCN5245_zpsprga4evo.jpg


I used a plumb bob to accurately mark the ground where the firemans pole would go.

DSCN5247_zpsxuhybnh8.jpg


DSCN5248_zpstufbcoyp.jpg


We fitted an OZ Pig in the corner.

DSCN5227_zpsdi0kyyc4.jpg


And used a plumb bob again to mark the roof where the hole needed drilling for the chimney.

DSCN5249_zpsrmyt6sre.jpg


Michael used a hole saw to make the hole in the roof.

DSCN5250_zpswwkczpjt.jpg


DSCN5251_zpsnw4hcw4t.jpg


For the chimney we had brought with us 2 lengths of exhaust pipe which we had flared the ends and painted black.

DSCN5252_zpsage71nim.jpg


DSCN5253_zpsz0exnhve.jpg


We siliconed on a piece of lead to seal the hole in the roof and I fitted a piece of alluminium I bent up, to keep the rain out.

DSCN5254_zpskp6adduh.jpg


DSCN5255_zps2ns4dd7p.jpg


Alan cut a tree down which was right in the middle of where the new handrail would be going.

DSCN5228_zpshrssx9uz.jpg


DSCN5230_zpsbxuyoeww.jpg


DSCN5231_zpszpiujyj0.jpg


Back to the firemans pole.......................

DSCN5256_zpsncmyahoc.jpg


DSCN5258_zpshsgrsdci.jpg


DSCN5259_zpswybsthpk.jpg


We could now drill the hole in the ground ready to concrete the pole in position.

DSCN5260_zpsfq7noukc.jpg


Done!

DSCN5261_zpsdxfvrynb.jpg


DSCN5264_zpsiickij38.jpg


DSCN5265_zpsqr801d5k.jpg


DSCN5266_zpspcpq6gbs.jpg


DSCN5267_zpskl4obeof.jpg


DSCN5268_zpszkwt6z5u.jpg


We fitted an old chandelier.

DSCN5270_zpsl7bawxih.jpg


DSCN5272_zpsb9l8hzeh.jpg


DSCN5273_zpsysrxpcku.jpg


DSCN5275_zps4vqyw6m8.jpg


DSCN5276_zps4xayb7ew.jpg


DSCN5280_zpsy6ezk4wa.jpg


DSCN5284_zpsiyand1bl.jpg


I made a bracket to secure the old ladder in position.

DSCN5285_zpsmiyy3f7g.jpg


DSCN5293_zpse37mrgqi.jpg


DSCN5292_zpsmzcw6ham.jpg


We screwed some tin sheets behind the OZ Pig to ensure the ply wood walls dont get scorched.

DSCN5287_zpsoa3fdctw.jpg


DSCN5289_zpskrdlzgre.jpg


DSCN5290_zpsfygio16v.jpg


DSCN5294_zpstb9wlbe4.jpg


A few daylight pics the next morning.

DSCN5296_zpsxqg2trms.jpg


DSCN5299_zpsnqe2lhan.jpg


DSCN5301_zpst0lkcbcx.jpg


DSCN5304_zpstq17ngwz.jpg


DSCN5305_zpskwoefkzj.jpg


DSCN5308_zpsjauz9xpv.jpg


DSCN5311_zpsnz4ytnyf.jpg


DSCN5312_zpsfg0gej4a.jpg


I fitted the handrails.

DSCN5313_zpszelnli03.jpg


4x2 oak with all the corners planed off, with a piece of 2x1 screwed along the bottom. The 2x1 is to mount all the upright spindles to, which will be made out of pieces of branch/log and screwed to the 2x1.

DSCN5314_zps7wmydjwe.jpg


DSCN5315_zpspw5erkxy.jpg


DSCN5316_zpsr0ungeoc.jpg


We were joined by this friendly and colorful little fella.

DSCN5317_zps42z20scq.jpg


DSCN5318_zpsaydzwyeb.jpg


Alan finally got all the lights working.

DSCN5321_zpsvkzrz95i.jpg


Alan and Peter got to work drilling the holes for the cypress pine posts at the bottom of the stairs.

DSCN5326_zpsjtyfxqsp.jpg


DSCN5327_zpsm9sfvedy.jpg


While I carried on fitting the handrails.

DSCN5328_zpsoqhcihbx.jpg


DSCN5329_zpsbf0jrwvj.jpg


DSCN5330_zpsc0c6a2i3.jpg


DSCN5331_zpsfvqlx9gj.jpg


A bit more trimming of the cut off tree was necessary.

DSCN5332_zps11ovzsqz.jpg


DSCN5333_zpsqlfjb0ch.jpg


I used Peters awesome cordless electric chain saw to trim up the last bit so that the handrail would fit snugly into the tree.

Tree%20House%206%20600%20x%20338_zpsu4nxam8u.jpg


Handrails fitted.

DSCN5334_zpspkcpk9jc.jpg


DSCN5335_zpsutjk3xtq.jpg


Gate next, which just happened to be the perfect size!

DSCN5337_zpss17ypwrj.jpg


DSCN5336_zps9ydd6hvz.jpg


DSCN5338_zpsh8fogfv1.jpg


DSCN5339_zpsxcaach1y.jpg


DSCN5340_zpstjzobdf5.jpg


DSCN5341_zpsshxdttsa.jpg


DSCN5342_zps0sbt8kqn.jpg


Fitted a handrail on the mezzanine.

DSCN5343_zpsydspwl2y.jpg


DSCN5344_zpsnv3tzbdm.jpg


We brought a chair up and found a nice old wire basket for fire wood.

DSCN5345_zpsdt8klgcc.jpg


DSCN5346_zpstmssm5ca.jpg


DSCN5347_zpsq4myzkx5.jpg


DSCN5348_zpsju0wigd8.jpg


DSCN5349_zpsuyjxcew8.jpg


DSCN5350_zpsnpofeusc.jpg


Last job was to trim the table on the veranda.

First Alan took the front edge off to give a bit more room for walking along the deck.

DSCN5351_zpsm2b6fx0b.jpg


And then I re-cut the top to get it nice and level.

DSCN5353_zpsf982rqyy.jpg


DSCN5354_zpsblhnrdai.jpg


DSCN5357_zpsyd3uwjdq.jpg


Its the perfect height to sit your drink on!

DSCN5359_zps1fm5yx84.jpg


DSCN5360_zpsnhwilooa.jpg


We cleaned up and packed the 60 ready to leave.

I then took a few last pics as I probably wont be back for a while!

DSCN5363_zpsmjz6wg36.jpg


DSCN5364_zpskvs87ras.jpg


DSCN5366_zpsg9ncepus.jpg


DSCN5367_zps5oseigya.jpg


DSCN5368_zpscmwjmz1r.jpg


DSCN5375_zpsajdqica8.jpg


DSCN5373_zpsq8t0dppr.jpg


DSCN5371_zpsa6m2gy9i.jpg


DSCN5376_zpso6kwzkk0.jpg


DSCN5377_zpswkpqazqq.jpg


DSCN5379_zpsuomj1gtu.jpg


DSCN5381_zpsr5y4gfby.jpg


DSCN5382_zpsyhnzzs6h.jpg


DSCN5385_zpsozyc4fbm.jpg


DSCN5389_zps3j8uutqa.jpg


DSCN5390_zpspekstxbl.jpg


DSCN5393_zpsfqpxbmph.jpg


DSCN5394_zps7mayirhq.jpg


DSCN5396_zpsgrg6mfaj.jpg


DSCN5397_zpsyolj0crx.jpg


DSCN5398_zpswl9cj0l8.jpg


Spotted this cute little guy while doing a final check for escaped sheep before leaving.

DSCN5386_zpsmbigrlvs.jpg


And finally after 4 ridiculously long days the 60 was packed and we were on our way.

DSCN5400_zpsfajgr2lp.jpg
 
Don't like the adverts?  Click here to remove them
Time for an update mate! You don't normally leave it this long between posts. Must be busy with the move?
 
Thanks guys. :thumbup:

Update coming over the next few days Ash. :icon-wink:

Its been one hell of a journey! We spent 7 days straight on the road, driving up and down. Everything went smoothly even when we got caught up in a bush fire which jumped the Hume motorway right in front of us and amazingly all the fish survived being in minimal water for 50 hours and being bounced around in a car for over 20! :icon-biggrin:

Busy trying to get the house and garage unpacked and sorted at the moment. :sleeping-sleep:

:text-merryxmas: & :text-happynewyear: Guys. :thumbup: :occasion-xmas:
 
And a Merry Christmas to you Ben, take a break and raise a glass to 2016 mate :thumbup:
 
End of an era...............And the big move up!

OK update time..............

During my last week of work I finished building the gate for the side of my bosses house and installed it.

The frame.

DSCN5401_zpsrljh27fx.jpg


The gate.

DSCN5402_zpswavmueeb.jpg


DSCN5408_zps5sn315ef.jpg


Clad it in hardwood planks.

DSCN5413_zpsnvefzqpq.jpg


DSCN5414_zpsnlwddqay.jpg


DSCN5417_zpslif6yego.jpg


Fitted.

DSCN5418_zpsestsqo2f.jpg


DSCN5419_zpslj5vpijy.jpg


DSCN5421_zpsoprfdflx.jpg


DSCN5422_zpsi4stjhg9.jpg


I made a gate for the tree house that will be fitted in front of the firemans pole to guard against people accidentally falling.

Bent some 25mm tube.

DSCN5403_zpsjobmot9f.jpg


DSCN5404_zpsdepnc8tc.jpg


Worked the hinges out.

DSCN5405_zpsno4qxwlz.jpg


DSCN5406_zpsucp1uqi8.jpg


DSCN5407_zpsnol28ouu.jpg


Got it electro plated.

DSCN5415_zpsq1yggsey.jpg


DSCN5416_zps7urfudbf.jpg


I had to modify another Warn 8274 High Mount winch.

DSCN5409_zpsczmtjnsj.jpg


DSCN5410_zpsqfzshzt6.jpg


TIG welded some chunks of alluminium on.

DSCN5411_zpstwogtq4f.jpg


DSCN5412_zpsjmcaqglh.jpg


A quick lick of paint and it was ready to reassemble.

DSCN5423_zpsqup4qleg.jpg


DSCN5424_zpsszayvtxn.jpg


Cut some M12 all thread and hose.

DSCN5426_zps3yfuyt8l.jpg


DSCN5427_zpsrj1rroad.jpg


DSCN5428_zpsbu6xbgzu.jpg


I made some more Jeep Wrangler battery trays.

DSCN5432_zpsmkj7dpfq.jpg


DSCN5433_zps2nts9zws.jpg


DSCN5434_zpssuoygi1j.jpg


Bec baked another yummy chocolate cake for me to take in and share with everyone at Piranha on my last day.

DSCN5429_zpsxyp9dkm4.jpg


I'm really going to miss this place! :cry:

DSCN5435_zpsjhr9uh4d.jpg


The last 2.5 years have been an absolute blast and it has without doubt been the best job I've ever had, if you can really call it a job! :clap: :dance:

But nothing lasts forever and for me to be able to live the sort of lifestyle I want, Melbourne's climate and weather just isnt suitable!

So it was time to make the big move up to Queensland! :icon-cool:

I finished work at 4pm and picked up the biggest truck Budget have in their fleet.

12435668_10153521464703509_1493927230_n_zpsua2zft5w.jpg


DSCN5436_zpsiatnaceo.jpg


With help from my now ex workmate we had the truck loaded in a few hours.

12421661_10153521464813509_2119218390_n_zpsroaaw89p.jpg


We left at 4am the next morning to start our huge 3600 km truck journey.

DSCN5437_zpsgmxoumkb.jpg


DSCN5438_zpsxu8jsy14.jpg


DSCN5439_zpslpb7cb8s.jpg


The truck was very easy to drive out on the open road, but it desperately needed a 7th gear as with the accelerator pushed all the way to the floor it would cruise at 104kmh, which was perfect as legally I was only allowed to do 100 anyway, so we just did the whole trip at 104. But another gear would have been nice to bring the revs down a bit and use less fuel.

DSCN5440_zpsigexewfk.jpg


DSCN5444_zpsb6mlo1ex.jpg


We headed inland up the Newel Highway on the way up. It wasnt a bad road, with long straights and virtually no hills!

DSCN5445_zpsnolvwcjy.jpg


Fuel stops were a regular thing as we never knew how long it would be until we would see another. Sometimes it would be 100k's+.

DSCN5446_zpsog96wsas.jpg


Our average fuel price was $1.22 or £0.59 in my old money, so pretty bloody cheap compared to UK prices!

In total we used about $1100 to go up and down in the truck!

The ultra high flow pumps made quick work of pumping it into the tank!

DSCN5447_zpszemtgqah.jpg








We drove for 14 hours the first day, then stayed in a motel. Then the next day we drove for another 7.

And finally we got to the new house! :dance:



We unloaded the truck that afternoon/evening.

Then the next day we set off again to drive back to Melbourne.

We decided to come back the other way, down the coast to Sydney, then back to Melbourne along the Hume highway.



The Pacific Highway just North of Sydney is an engineering marvel! The road builders have cut straight through mountain after mountain and moved millions of tons of rock! :clap:





13 hours behind the wheel saw us get just past Sydney. We stayed in another motel for the night and then hit the road early the next morning.



It was a hot day with high winds and as we drove along the Hume we began to see smoke in the distance.





Soon we found ourselves in the middle of a bushfire! :wtf:

It had reached the highway and jumped across to the other side! The fire brigades were there tackling it but we wouldn't see any police to control the traffic for over an hour! This meant that the traffic just kept coming and it was chaos with the fire brigade stopping people from trying to get through!

We parked up and watched the action unfold!

























The CFA had issued a warning for the town advising it was too late to leave! :icon-neutral:







Soon their was a roar in the sky as water bombing planes began coming in and dropping huge quantities of water on the fire in a bid to save the town and the highway!













Eventually the police turned up and moved everyone on.

We had to drive through the fire threatened town and in land to loop around the fire and re-join the Hume further West.

As we drove through the town a lot of the residents were stood outside their homes, clearly terrified, watching the huge smoke clouds, praying the fire wouldn't destroy their town. :thumbdown:







Finally we were back on the Hume heading for Melbourne!





In typical Melbourne style it was raining again! :doh:





But we had done it! :dance:

4 days, 3600ks, 44 hours of driving, truck loaded and unloaded, job done! :icon-biggrin: :icon-biggrin: :icon-biggrin:

We stayed the night at the old house and in the morning we cleaned it top to bottom and returned the keys to the real estate agent.

Then it was time to drive our 2 blue Toyota's up to the new house! :icon-cool:



We put the fish in bags with minimal water inside an esky/cool box on Bec's front seat and left the bags open and the lid off the esky.





I picked up a handheld UHF radio out of the showroom at Piranha before I left, so that Bec could keep in constant contact with me.



And we hit the road.







We drove for 4 hours the first day as we didnt leave Melbourne until 3pm.

We arrived at the Victoria/New South Wales border which is divided by the huge Murray River.





We decided to stay at the Time Out camp site on the Victorian side.



We had to cross over a railway track which I could see went down to a pretty spectacular looking old bridge, but more on that later.



There was a myriad of 4wd tracks along the banks of the river that we saw as we drove to the campsite, and we could have just camped here quite easily and for free. But we decided it would be better to pay $30 and have a nice piece of cut and watered grass and proper toilets and showers.





We had the whole un-powered section to ourselves.





All that separated us and the river was a big levy.











As we got setup and began to think about dinner we were joined by lots of roos, keen to graze on the grass!









While Bec sat back and relaxed.



I cooked our dinner.



Yummy salmon and mash.



It began getting dark and then the strangest thing happened, something neither of us had ever experienced before.

The sky began lighting up as if it was morning time and the sun was about to rise.





We were then treated to the most amazing sunset! It was breath taking! :icon-biggrin:









The next morning we awoke to find ourselves surrounded again by grazing roos.





I made breakfast.



Just as we were about to eat breakfast we were lucky enough to witness something not many people will ever see in the wild.

A koala walked through our camp site carrying her baby on her back. :icon-surprised: :icon-biggrin:









She then began to climb a tree.





Then the father appeared and walked over and after a bit of growling, climbed another tree opposite them!

















It was an incredible experience and we were very lucky to see them on the ground like that as normally you only see them high up in the trees!

We left them to have a sleep in the trees and enjoyed our breakfast next to the river, watched over by singing birds.









We packed up and drove out of the camp and stopped on the way to look at the bridge.











We crossed back over into New South Wales and continued on up the Newel Highway.







We drove through many towns along the way and one even had a full size tank which I thought was pretty cool.







I liked this and I think its true! "With Passion Anything Is Possible" :icon-biggrin:



A quick lunch stop.



By 6pm we had been on the road for over 8 hours and decided to call it a day.

We tried to find a camp spot in a national park I spotted on the map.









After driving for half an hour and not spotting any where we decided to head back to the highway and find some where in a little town we passed through.

The young guy on the counter at the camp site was really friendly and said as it looked like it was going to rain we could park under the shelter/camp kitchen in the unpowered camping area.

So I decided to set the tent up under it and got dinner on.





Lamb shanks and mash.



And of course ice cold beers out of the Engel. :icon-cool:







The next morning.



Yummy sausage, egg and cheese sandwiches again.



Then we were on the road again for the final 8.5 hours of driving.









Past lots more grain silos and trains picking it up.





And finally we were back in sunny Queensland! :dance:





Funny sign!



















Saw my first Tesla on the road! :icon-cool:





Finally almost back in the beautiful Gold Coast hinterland! :dance:





Both Toyotas obviously performed faultlessly for the entire journey! :icon-cool:

Although I definitely need to fit stiffer springs in the rear and need to get the aircon install finished! :think:

We were completely exhausted as we had now been on the road for 7 days driving huge distances, but the first thing that needed doing was the fish as they had now been in the bags for 50 hours and bounced around in a car for over 20!



The tank fitted nicely in Bec's boot.



I half filled the aquarium with water and floated the bags the fish were in, in the water for half an hour to get them used to the temp of their new water.





Then released them.

They were a bit shell shocked for the first 12 hours. But as soon as I added all their ornaments, plants and more water they perked right up and were back to normal.





I'm amazed we didnt lose any! :wtf: :dance:

The house and the garage were obviously a complete mess with boxes everywhere!

I was keen to crack on and get the garage/my workshop sorted!

Certainly the poshest one I've ever had what with plastered walls, coving and even an electric door! :icon-biggrin:





Sadly its a bit smaller than I need and with no shed its been a bit of a nightmare trying to fit everything in!

But I got there in the end. :dance:











I got some lights wired up over my benches.



One thing I'm totally stoked about is the fact I found LJ fits in, with the roof rack removed! :dance: :icon-biggrin: :icon-cool:





And theres still plenty of room for motorbike storage and to work! :icon-cool:



So were in! :dance:

And just in time for Christmas! :occasion-xmas:

I cooked Bec and I a yummy Christmas dinner with Beef, turkey, pigs in blankets, yorkshire puddings, roast potatoes and veggies. Was delicious! :drool:





And Bec made an amazing trifle.



It was a lovely quiet Christmas together and the weather was fantastic! :flags-australia:



Tomorrow I fly down to Melbourne to drive the Astra up. I will sit on 115kmh the whole way and just pull over and sleep in the car when I'm tired, for a few hours then carry on. So will be back the following day. :icon-biggrin:

Then were off to my beloved Byron for a few days of camping, relaxing and partying to celebrate the new year. :dance:

Then I suppose I should probably find a job if I'm to buy myself a motorbike, a jetski a puppy and a wedding at the end of the year. :think:

Next year is going to be a great year I'm sure!

Happy New year in advance guys. :thumbup:
 
Last edited:
Happy New Year Ben and Bec. It's going to be a blinder!! Those shots of the sunset and koalas are fantastic! I am very envious of that garage!

Good luck to you both. "With passion anything is possible"…good one!
 
A typically indecisive plan from you again Ben , i sometimes wonder how you get anything done :lol: all the best for the year ahead guys :thumbup:
 
Happy New Year Ben and Bec. :text-happynewyear: sounds like a great year you have planned.
 
Happy New Year Ben & Bec.

I think you should adopt that phrase as your family motto. Enjoy Byron and relax....
 
Good on you both,like all others we have followed your doings with great interest.
 
Happy new Year Ben, looks like you ended this one with a Bang! Bring on 2016!
 
Hi Ben and Bec you r having one hell of a good time good look from Tony.
 
Back
Top