Work continued this weekend. I continued to plumb the long range tank in working on the pipe work and mounting of the transfer pump. The filler neck for the long range tank plus the electrics for the fuel gauge and transfer pump still need to be done.
I've been having a right time trying to get the ARB compressor mounted so that it doesn't interfere with the draw runners, too much time doing and not enough time planning. Plan C is to mount it to ply and then attach to the drawers - should be much easier this way.
View attachment 154679
Sarah was working on the tail gate installation whilst I was on long range tank duty and snorkel fitting.
View attachment 154681
View attachment 154676
View attachment 154673
Job done.
View attachment 154677
View attachment 154674 View attachment 154675 View attachment 154678 View attachment 154680
Very nice too, looking the business, nice work indeed